60
4.4
Battery drawers installation
The cabinet for Keor MOD 125 may include two to ten internal battery drawers. Each battery string is made up of two
drawers, therefore it is necessary to install them two by two.
The battery drawers have a specific order in the cabinet that must be kept, especially if the UPS has to work in a configu-
ration with indipendent strings of batteries.
During the installation it is necessary to use the appropriate Personal Protective Equipment (see paragraph 2.3).
4. Installation
Summary of Contents for Keor MOD 100
Page 1: ...Part LE11406AB 04 19 01 GF Keor MOD Installation and maintenance manual ...
Page 2: ...2 EN ENGLISH 3 Keor MOD ...
Page 20: ...20 4 Installation 3 4 5 ...
Page 22: ...22 4 Installation 9 10 ...
Page 24: ...24 4 Installation KEOR MOD 250 earthing bars ...
Page 79: ...Keor MOD Installation and maintenance manual 79 6 3 3 Removal of the SSS drawer 1 2 3 4 ...
Page 87: ...Keor MOD Installation and maintenance manual 87 ...
Page 88: ...88 9 Mechanical characteristics ...
Page 89: ...Keor MOD Installation and maintenance manual 89 ...
Page 90: ...90 9 Mechanical characteristics ...
Page 92: ...92 9 Mechanical characteristics 9 3 Battery drawer all the dimensions are in mm ...