Installation Instructions
LPE1U
9
10. Attach control pad bracket (R) to column assembly (T) using
5/16-18 x 1/2" button head cap screw (G). (See Figure 5)
Figure 5
11. Secure control pad (E1) into control pad bracket (R). (See
Figure 5)
NOTE:
Control pad may also be attached to bottom of display
using double-sided tape (U) after display has been
installed.
12. Route control pad cable (E1) through side channel. (See
Figure 6) and (See Figure 7)
Figure 6
13. Remove back cover to expose control box. (See Figure 7)
14. Route control pad cable (E1) and motor cable (E2) behind
back cover plate (B1) and into corresponding ports on
control box.
(See Figure 7) and (See Figure 8)
•
Control pad cable (E1) plugs into port A1.
•
Motor cable (E2) plugs into port 1.
NOTE:
Back cover plate (B1) may need to be pulled back or
loosened in order to fit cables behind it.
NOTE:
Use cable ties (K) and pre-installed cable clips to
provide tension relief.
Figure 7
IMPORTANT ! :
Lower cover (B2) should only be
installed after all cables have been routed with no load.
15. Slide lower cover (B2) onto column assembly (T) and use
two 8-32 x 3/8" Phillips pan machine screws (F) to secure
bottom back cover (B1) to lower cover (B2). (See Figure 8)
Figure 8
(G)
10
(R)
11
12
(E2)
(E1)
14
13
(X)
(E2)
into port "A1"
into port "1"
14
(K) x 2 for tension relief
(B2)
15
15
(B1)
(F) x 2
15