
Installation and start-up of KEOR HPE UPS 200-250-300 kVA
Installation et démarrage de l’ASI KEOR HPE 200-250-300 kVA
Installazione e avviamento KEOR HPE UPS 200-250-300 kVA
OMP06262 REV. B
43
1)
Close the rectifier input switch RCB. After some seconds the
touch screen
will start and will
show the UPS mimic diagram.
Picture 11 – UPS start-up page
2)
After the software loading phase the control logic will acquire the system status and the
operation of the RCB switch, and will show the operating sequences.
Picture 12 – Rectifier start-up
Summary of Contents for BSK93
Page 3: ......
Page 5: ......
Page 176: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 10 OMG38225 REV F ...
Page 278: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 112 OMG38225 REV F ...
Page 330: ......
Page 644: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 158 OMP06263 REV B ...
Page 662: ......
Page 976: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 158 OMP06263 REV B ...
Page 994: ......
Page 996: ......
Page 1235: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 10 OMW07104 REV A ...
Page 1286: ......
Page 1337: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 112 OMW07104 REV A ...
Page 1397: ...11 WWW UPS LEGRAND COM UPS CONVENTIONAL UPS ...