Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l’ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
52
OMW07096 REV. E
NOTES: If the internal battery are already installed inside the UPS
C) C
arry out the operations as indicated in the following label installed
inside the UPS
Figure 30 – Warning indications for internal battery
D)
Follow the instructions from point 18 to point 23 of this chapter
2) Connect the 2 cables
“+B”
on the battery terminal
3) Connect the 2 cables
“N”
on the battery neutral terminal
4) Connect the 2 cables
“-B”
on the battery terminal
Picture 30A - Battery terminals
Summary of Contents for BSK93
Page 3: ......
Page 5: ......
Page 176: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 10 OMG38225 REV F ...
Page 278: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 112 OMG38225 REV F ...
Page 330: ......
Page 644: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 158 OMP06263 REV B ...
Page 662: ......
Page 976: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 158 OMP06263 REV B ...
Page 994: ......
Page 996: ......
Page 1235: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 10 OMW07104 REV A ...
Page 1286: ......
Page 1337: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 112 OMW07104 REV A ...
Page 1397: ...11 WWW UPS LEGRAND COM UPS CONVENTIONAL UPS ...