38
INSTALLATION AND MAINTENANCE MANUAL
554515_A_PUB_DATE_1_FEB_2014.DOC
MACHINE ANCHORING 40-55 kg / 100-125 lb WITH FORWARD TILTING – ON REQUEST
Drill a hole for the anchoring bolt based on the required machine placement – see figures 4.3.F and G.
Remove the upper nut and washer from the anchor bolt. Place the anchor bolt into the pre-drilled hole,
place the machine in position (the bolt goes through the air spring plate) attach the washer and nut back
again and tighten.
Figure 4.3.H – Machines 40-55 kg / 100-125 lb
with forward tilting – make sure the clearance is
the same on both sides of the pins.
THREADED ROD
M14 x 120 AND
CHEMICAL FILLING
ARE NOT SUPPLIED
WITH THE MACHINE
ANCHORING BOLT
(SUPPLIED
WITH THE
MACHINE)
Figure 4.3.F – Machines 40-55 kg / 100-125 lb
with forward tilting and without
the weighing
system – drilling points for anchoring bolts, (machine
cabinet dimensions are stated in mm / inches)
ANCHORING BOLT
(SUPPLIED
WITH THE
MACHINE)
Figure 4.3.G – Machines 40-55 kg / 100-125 lb
with forward tilting and with
the weighing system
– drilling points for anchoring bolts, (machine
cabinet dimensions are stated in mm / inches)
VIEW FROM ABOVE
VIEW FROM
ABOVE
REAR SIDE
FRONT SIDE
REAR SIDE
FRONT SIDE