
Sequence of my build
Gluing and painting
7- Installed siding, make sure
siding facing front installed first
then side wall.
The taller side wall precut siding
goes on the bottom floor.
8- installed main door and
glued porch
9- installed porch post and roof
9- installed 2
nd
floor front facing
Siding.
6- Placed weights on top
And allowed glue to set.