![Laser Dollhouse Designs Stansfield Victorian Dollhouse Assembly Instructions Manual Download Page 44](http://html.mh-extra.com/html/laser-dollhouse-designs/stansfield-victorian-dollhouse/stansfield-victorian-dollhouse_assembly-instructions-manual_677624044.webp)
House
Dry Assembly
Figure 75
Step 51.
This step requires gluing in the dry assembly…
Glue the 5 panel supports to the side panel. Figure 75.
Step 52. Using the roof panel
(DO NOT GLUE)
rotate upside down and install only the long slot to the panel so that the glue may dry and
maintain alignment.
Step 53. Insert the round dowel in fig 77 into the hole at each end of the opening in figure 78. You will find it is a snug fit so rotate up and
down as you apply pressure to insert and then apply the opposite end and again rotate that end into place. Test that opening functions and
opens and closes. Figure 79. Next install outer roof panel, figure 80. If you need to open the panel and align by reaching through the
opening in the bottom.
Figure 76
Figure 77
Figure 78
Figure 79
Figure 80