House
Dry Assembly
Figure 28
Step 27. locate all roof part marked R1 thru R11, R11A, R12, R13, R14, and R14A. Figure 28
Step 28. Install R9 and R13, figure 29
Step 29. Install R8, figurer 30
Step 30. Install R12, figure 31
Step 31. Locate part T1, figure 32.
Figure 30
Figure 29
Figure 31
Figure 32