Ed. 001 - 12/2015
www.larius.eu
ZEUS LINER
28
N33
N32
N35
Rif. 16325
N37
N36
N38
N6
• To assemble all the parts in the correct sequence, see the
exploded diagram on page 44.
• Close the seal ring nut (
N35
) all the way.
• Lubricate the upper crown (
N36
) using oil (
N37)
(Ref. 16325)
;
• Tighten the pump casing all the way and, if the delivery pipe
is not correctly aligned, unscrew the pump casing until the
connection is in the correct position before tightening by using
the ring nut (
N32
) and the pin (
N33
) supplied
(Ref. 20144)
.
• When refitting the pump unit on the machine, the stem
must be at its highest point possible.
• Insert the stem into the connecting rod and insert the fixing
pin (
N6
).
• Refit the inspection barrier (
N38
);
Ref. 20144
Closing/opening
pin
Oil ring