N
N
REPLACEMENT OF THE PUMPING GROUP’S GASKETS
Each time you use the machine, check for material leaking from
the top of the ring nut.
If any material leaks out when the pump is working at the set
pressure, proceed as follows:
• Carry out this operation after cleaning the tooling.
Always disconnect the power supply and release
pressure before going on with the operations
(follow the “correct procedure of decompression)
.
The gaskets are self-adjusting. If a leak occurs
they must be replaced.
• Disconnect the product feed hose (
N1
) from the pump unit
by unscrewing the nut (
N2
).
• Unscrew the fixing ring nut (
N3
) using the relevant closing
pin
(Ref. 20144)
.
• Release the plastic cover (
N4
).
• Screw the appropriate supplied tool (
N5
)
(rif. 20213)
into
the threaded hole on the holding pin (
N6
).
• Remove the pin (
N6
) from its seating.
Ed. 001 - 12/2015
www.larius.eu
ZEUS LINER
22
N4
N6
Rif. 20144
N2
N1
N5
Rif. 20213
N6
N3