WARRANTY
MANUFACTURER’S GUARANTEE POLICY
LANDOLL CORPORATION WARRANTY
LANDOLL warrants each new and unused LANDOLL machine, when
properly assembled, adjusted, and operated, to be free of defects in
material and workmanship, in normal use and when properly serviced,
for a period of twelve (12) months after date of delivery by the Dealer to
the original retail purchaser. LANDOLL shall repair or replace, at its op-
tion, freight on board (f.o.b.) at its factory or designated DEALER loca-
tion, any part or parts of such new and unused machine which shall
have been reported in writing to LANDOLL within thirty (30) days from
date of failure thereof and which LANDOLL inspection shall disclose to
have been defective. Defective parts must be returned to the LANDOLL
factory, freight prepaid. LANDOLL will not be liable for labor, transpor-
tation, or any other charges resulting from replacement of a defective
part. This warranty is void if any part not supplied by LANDOLL is used
in assembly or repair, or if the machine has been altered, abused, or
neglected. LANDOLL repair parts are warranted for ninety (90) days
from date of replacement or for the unexpired warranty period of the
applicable LANDOLL machine, whichever period is longer. LANDOLL
makes no warranty, whatsoever, as to purchased component parts and
other trade accessories, except to the extent that such items are war-
ranted by the manufacturer thereof. THIS WARRANTY IS EXCLUSIVE
AND IN LIEU OF ALL OTHER WARRANTIES, WHETHER EXPRESSED,
IMPLIED, OR STATUTORY (INCLUDING WARRANTIES OF MERCHANT-
ABILITY AND FITNESS FOR PURPOSE), AND LANDOLL SHALL NOT BE
LIABLE FOR SPECIAL OR CONSEQUENTIAL DAMAGES OF ANY KIND
ON ACCOUNT OF ANY LANDOLL PRODUCT.
NO EMPLOYEE OR REPRESENTATIVE IS AUTHORIZED TO CHANGE
THIS WARRANTY, VERBALLY OR IN WRITING, OR GRANT ANY OTHER
WARRANTY.
LANDOLL CORPORATION, WHOSE POLICY IS ONE OF CONTINUOUS
IMPROVEMENT, RESERVES THE RIGHT TO MAKE CHANGES WITHOUT
OBLIGATION TO MODIFY PREVIOUSLY PRODUCED EQUIPMENT.
Summary of Contents for SOIL MASTER II 1200 Series
Page 7: ......
Page 11: ...2 4 Figure 2 1 Rigid 7 9 Shank Spacing...
Page 12: ...2 5 Figure 2 2 Rigid 11 Shank Spacing...
Page 13: ...2 6 Figure 2 3 Rigid 13 Shank Spacing...
Page 14: ...2 7 Figure 2 4 Wing 15 Shank Spacing...
Page 15: ...2 8 Figure 2 5 Wing 17 Shank Spacing...
Page 16: ...2 9 Figure 2 6 Wing 19 Shank Spacing...
Page 17: ...NOTES 2 10...
Page 19: ...3 2 Figure 3 1 Frame Assembly Rigid...
Page 21: ...3 4 Figure 3 2 Frame Assembly Folding...
Page 29: ...3 12 Figure 3 7 Hydraulic Fold Assembly...
Page 31: ...3 14 Figure 3 8 Pull Hitch Installation...
Page 33: ...3 16 Figure 3 9 Coulter Gang Installation...
Page 34: ...3 17 Figure 3 10 Coulter Depth Adjustment...
Page 35: ...3 18 Figure 3 11 Coulter Gang Hydraulic Assembly...
Page 37: ...3 20 Figure 3 12 Clamp Assemblies...
Page 39: ...3 22 Figure 3 13 Electrical Installation...
Page 41: ...3 24 Figure 3 14 1200 Series Decal Placement 1 of 2...
Page 42: ...3 25 Figure 3 15 1200 Series Decal Placement 2 of 2...
Page 51: ......
Page 53: ...NOTES 5 3...
Page 54: ......