4-7 TRANSPORT
4-7.1
Raise the unit to full transport height.
4-7.2
Fold the wings and install the wing lock
pins
(See Figure 4-2)
.
4-7.3
Place the cylinder lockouts on the rod of
the lift cylinders on the main frame and pin in
place.
WARNING
FAILURE TO USE CYLINDER LOCK-
OUTS AND PINS DURING TRANSPORT
MAY RESULT IN PERMANENT EQUIP-
MENT DAMAGE, SERIOUS INJURY, OR
DEATH.
4-5
Figure 4-2 Frame Lift Cylinders
LUBRICATION
ITEM
DESCRIPTION
NO. OF
LUBE
POINTS
INTERVAL (Hours
unless stated)
1
Radius rod
2
50
2
Gauge wheel pivot pin
1
10
3
Coulter bearing block
1
5
4
Spring clamp
1
5
5
Walking beam
1
Yearly
6
Wheel bearing
1
Yearly
7
Depth adjust rod
2
50
8
Coulter gang bearing
1
5
9
Wing fold pins (fold models only)
1
10
NOTE: LUBE ALL POINTS WITH HIGH GRADE MULTI-PURPOSE GREASE.
Table 4-1 Lubrication Schedule
Summary of Contents for SOIL MASTER II 1200 Series
Page 7: ......
Page 11: ...2 4 Figure 2 1 Rigid 7 9 Shank Spacing...
Page 12: ...2 5 Figure 2 2 Rigid 11 Shank Spacing...
Page 13: ...2 6 Figure 2 3 Rigid 13 Shank Spacing...
Page 14: ...2 7 Figure 2 4 Wing 15 Shank Spacing...
Page 15: ...2 8 Figure 2 5 Wing 17 Shank Spacing...
Page 16: ...2 9 Figure 2 6 Wing 19 Shank Spacing...
Page 17: ...NOTES 2 10...
Page 19: ...3 2 Figure 3 1 Frame Assembly Rigid...
Page 21: ...3 4 Figure 3 2 Frame Assembly Folding...
Page 29: ...3 12 Figure 3 7 Hydraulic Fold Assembly...
Page 31: ...3 14 Figure 3 8 Pull Hitch Installation...
Page 33: ...3 16 Figure 3 9 Coulter Gang Installation...
Page 34: ...3 17 Figure 3 10 Coulter Depth Adjustment...
Page 35: ...3 18 Figure 3 11 Coulter Gang Hydraulic Assembly...
Page 37: ...3 20 Figure 3 12 Clamp Assemblies...
Page 39: ...3 22 Figure 3 13 Electrical Installation...
Page 41: ...3 24 Figure 3 14 1200 Series Decal Placement 1 of 2...
Page 42: ...3 25 Figure 3 15 1200 Series Decal Placement 2 of 2...
Page 51: ......
Page 53: ...NOTES 5 3...
Page 54: ......