Installation and Binding of External Devices Issue: 1.8
Page 25 of 69
E470 Tokenless Smart Prepayment Meter
© Gyr
Data Item
Returned in1 Details
Rate 4 kWh register
P
Total kWh register
P
Export energy register
P
NOTE:
The transfer of all metering data to the system will allow all
parameters to be sent back down to an exchange meter when the same
MPAN is used in the new meter.
5.2.2 Meter Removal
When the meter removal code is entered, the meter will send a snapshot of
metering data to allow a final read to be arranged. The information will
include:
Data Item
Returned in1 Details
Date and Time stamp
H
Electricity Meter Status flags2
H
Message ID
P
Message ID = REMOVAL
MPAN/Customer #
P
Meter Serial Number
P
Credit Mode
P
Denotes credit or prepayment operating mode
Emergency credit flags
P
Denotes emergency credit taken or not
Present Balance Register
P
Arrears Register
P
Rate 1 kWh register
P
Rate 2 kWh register
P
Rate 3 kWh register
P
Rate 4 kWh register
P
Total kWh register
P
Export energy register
P