Page 24 of 69
Issue: 1.8
Installation and Binding of External Devices
© Gyr
E470 Tokenless Smart Prepayment Meter
Data Item
Returned in1 Details
Arrears Register
P
Rate 1 kWh register
P
Rate 2 kWh register
P
Rate 3 kWh register
P
Rate 4 kWh register
P
Total kWh register
P
Export energy register
P
Meter Removal Code
P
Meter Exchange code
P
Meter Fitter Authorisation Code
P
Return Data – Following the installation process the meter will be sent a full
configuration set of operation data including tariffs etc, from the utilities
information system. Additionally the meter may be sent Present balance
data and Arrears data if the meter is a replacement meter subject to an
exchange process.
5.2 Decommissioning
Decommissioning of a meter is achieved by entering one of the two
decommissioning codes sent to the system at installation. NOTE: The
meter engineer would be instructed of the codes by use of the system.
The entry of the Decommissioning Codes is achieved using the using the
standard Purchase Code entry procedure - see display section. Once 6
digits have been entered the installer can offer the code to the meter by
pressing and holding both buttons for 2 seconds. If the code does not
match the either the removal code or exchange code held in memory, the
meter will show ‘Error’ and clear the entry. Lock out procedure will apply
according to the Purchase Code entry scheme.
5.2.1 Meter Exchange
When the meter exchange code is entered the meter will send a snapshot
of meter data to the system. The information will include:
Data Item
Returned in1 Details
Date and Time stamp
H
Electricity Meter Status flags2
H
Message ID
P
Message ID = EXCHANGE
MPAN/Customer #
P
Meter Serial Number
P
Credit Mode
P
Denotes credit or prepayment operating mode
Emergency credit flags
P
Denotes emergency credit taken or not
Present Balance Register
P
Arrears Register
P
Rate 1 kWh register
P
Rate 2 kWh register
P
Rate 3 kWh register
P