background image

16

11.  Disconnect the Auger Motor wire harness from junction box.
12.  Remove the four (4) screws from the bracket holding the 

Auger Motor, flavor injector bracket, and LED light bracket.

13. 

Slide the Motor and Mounting Plate Assembly off of the 

Auger Shaft.

C

A

B

A. Auger Motor

B. Auger Shaft

C. Solenoid

14.  Remove the Auger Motor Shaft Key and set aside.
15.  Remove the second clip from the Auger Shaft.
16.  Disconnect the Ice Chute wire harness from the junction box.
17.  Disconnect the solenoid from Ice Chute link by pushing pin 

through shaft until link is free. (Pin shown in out position)

C

A

B

A. Solenoid

B. Solenoid Pin

C. Ice Chute Link

A

B

C

A. Agitator Clip/Pin

B. Hub

C. Agitator Bar

22.  Remove the Agitator bar and Hub from the Ice Bin.
23.  Remove the plastic Ice Shroud by”pinching” in the center 

and rotating out.

24.  Using the Cleaning Solution (page 14) and a clean cloth or 

soft brush, clean the Ice Chute Assembly, Ice Shroud, Auger, 

all sides of the Ice Bin, and surface of the aluminum casting.

25.  Using the Cleaning Solution and the sponge brush provided, 

clean all interior surfaces of the ice chute and the ice chute 

feed through.

26.  Using hot water, thoroughly rinse away the cleaning solution.
27.  Wearing sanitary gloves, use a clean cloth or towel and the 

Sanitizing Solution (page 14) to wash all surfaces of remov

-

able parts, sides of the Ice Bin, and surface of the aluminum 

casting.

28.  Using the Sanitizing Solution and the sponge brush          

provided, clean all interior surfaces of the ice chute and the 

ice chute feed through.

29.  Wearing sanitary gloves, reassemble all removable parts. 

Ensure agitator clip is locked.

30.  Fill unit with ice and replace Top Cover.
31.  Reconnect Dispenser to power source.

18.  Remove the Ice Chute Assembly by removing four (4) 

screws that secure to unit and set aside.

19.  Remove Auger by pulling straight out from unit and set aside.
20. 

Repeat Steps 5 - 14 for second Auger Motor Assembly.

21.  Remove Agitator Clip and Pin from Agitator bar in Ice Bin.

Cleaning & Sanitizing Syrup Lines - Bag in Box

1.  Disconnect syrup lines from BIB’s
2.  Place syrup lines, with BIB connectors, in a bucket of warm 

water.

3. 

Activate each valve to fill the lines with warm water and flush 

out syrup remaining in the lines.

4.  Prepare Cleaning Solution described on previous page 14. 
5.  Place syrup lines, with BIB connectors, into cleaning        

solution.

6. 

Activate each valve until lines are filled with cleaning        

solution then let stand for ten (10) minutes. 

7.  Flush out cleaning solution from the syrup lines using clean, 

warm water.

8.  Prepare Sanitizing Solution described on previous page 14. 
9.  Place syrup lines into sanitizing solution and activate each 

valve to fill with sanitizer. Let sit for ten (10) minutes.

10. 

Reconnect syrup lines to BIB’s and draw drinks to flush  

solution from the dispenser.

11. 

Taste the drink to verify that there is no off-taste. If off-taste 

is found, flush syrup system again.

 

Following sanitation, rinse with end-use product  

 

until there is no aftertaste. Do not use a fresh water    

 

rinse. This is a NSF requirement. Residual sanitizing    

 

solution left in the system creates a health hazard.

CAUTION

Summary of Contents for Twin Pour

Page 1: ...ss or for your convenience scan this QR code with a mobile device app required for immediate access to other Technical Documents and alternative translations if available pertaining to this unit Conta...

Page 2: ...ing 585 lbs 265 kg Operating w Ice 745 lbs 338 kg Ice Capacity 312 lbs 142 kg CARBON DIOXIDE CO2 SUPPLY Min Pressure 70 psi 0 483 MPa Max Pressure 80 psi 0 552 MPa FITTINGS Carbonator Inlet 3 8 inch b...

Page 3: ...re that the dispenser is level front to back and side to side Place a level on the top of the rear edge of the dispenser The bubble must settle between the level lines Repeat this procedure for the re...

Page 4: ...n a counterclockwise direction up to a 45 angle 4 Carefully pull ADA panel and electric wire harness from the unit s splash plate until the harness connector is visible 5 Disconnect ADA harness and re...

Page 5: ...Tube to become clogged with coffee or tea grounds or other solid particles ATTENTION 16 Reattach Drip Tray and Cup Rest to unit if applicable When installing the drip tray make sure both of the cold p...

Page 6: ...nut on the regulator adjustment screw of the high pressure CO2 regulator connected to the source then using a screwdriver back out lock nut screw all the way DO NOT TURN ON CO2 SUPPLY AT THIS TIME WA...

Page 7: ...d right screen by pressing the screen on off toggle buttons on the left side of the unit electrical box The manager s access to the service menu allows access to the Lighting screen see page 12 the So...

Page 8: ...flipping the switch on the control box NOTE To check for CO2 leaks close the valve on the CO2 cylinder and observe if the pressure to the system drops with the cylinder valve closed for five minutes O...

Page 9: ...Repeat Steps 4 and 5 for any of the other brand or flavor modules 8 Press the Menu button to return to the Service menu 12 Press the Menu button to return to the Service Menu 13 Repeat steps 1 12 for...

Page 10: ...m on page 17 for reference 1 From the Service menu press the Maintenance button 2 Remove the two thumb screws connecting the plastic screen housing to the unit See page 9 3 While holding the plastic s...

Page 11: ...9 for the remaining brand syrup modules 11 To re attach the screen housing first align the screen housing with the connection tabs on the unit then rotate the housing down untill the connection tabs...

Page 12: ...sing down untill the connection tabs engage 13 Re connect the two thumb screws removed in Step 2 14 Repeat steps 1 13 for the second screen Make sure both of the connection tabs are disengaged in the...

Page 13: ...problem with the specified brand and will dispense when activated Auto signifies that the configured Sold Out Sensor controls whether the brand can be dispensed This feature requires an optional sold...

Page 14: ...ble water at a temperature of 90 F to 110 F Extended lengths of product lines may require additional cleaning solution Sanitizing Solution Prepare the sanitizing solution in accordance with the manufa...

Page 15: ...twenty 20 seconds ensuring all surfaces of the nozzle have been thoroughly rinsed 9 Allow outer nozzle to air dry to expedite drying forced convection is recommended 10 Reinstall the outer nozzle to t...

Page 16: ...ll interior surfaces of the ice chute and the ice chute feed through 29 Wearing sanitary gloves reassemble all removable parts Ensure agitator clip is locked 30 Fill unit with ice and replace Top Cove...

Page 17: ...ement Residual sanitizing solution left in the system creates a health hazard CAUTION 7 Flush out cleaning solution from the flavor injector lines using clean warm water 8 Prepare Sanitizing Solution...

Page 18: ...ED 3 5a C B 3 5a C B 7A C B CONTROL PCB R CONTROL PCB L ICE SOLE ICE SOLE TRIGGER TRIGGER 12VDC 12VDC 24VDC 24VDC 24VDC 115VAC 24VDC 24VDC HDMI HDMI USB USB USB USB CTRL PCB CTRL PCB LEFT SIDE VALVES...

Page 19: ...Blk Red WHT N N N L N G V V V V GRN WHT BLK WHT BLK GRN GRN BLK WHT RED BLK RED WHT BLK WHT BLK BLK WHT WHT BLK BLK RED RED BLK GRN WHT BLK POWER SUPPLY AND IBD CONTROLLER BOX 2 to 1 adapter RIGHT RI...

Page 20: ...6 7 6 2 2 3 8 3 4 7 4 5 SW1 SWITCH 1 NOT USED FOR MODEL 4900 ON 5 4 SWITCH AGITATOR ON TIME 5 6 OFF OFF 11 SECONDS OFF ON 9 SECONDS ON OFF 7 SECONDS ON ON 5 SECONDS SWITCH AUGER RUN TIME 7 8 OFF OFF 6...

Reviews: