![Lamtec F130I Manual Download Page 16](http://html1.mh-extra.com/html/lamtec/f130i/f130i_manual_3441202016.webp)
15
4
Design and Functions
4
Design and Functions
4.1
Design
Fig. 4-1 Flame monitoring
The flame monitor consists of the F130l evaluation device and the flame sensors from chapter
The F130l evaluation device is connected by pluggable screw terminals.
The following connection terminals are available:
•
Supply of auxiliary power (mains voltage)
•
Connection for LDR sensor
•
Connection for ionisation electrode
•
Connection for UV tubes
•
Measurement output for ionisation current measurement
•
0/4..20mA analogue output for flame intensity
•
Alarm relay output
•
Flame signal output
The arrangement of the control and operating elements is shown in chapter
The connection and terminal connection diagram can be found in chapter
Summary of Contents for F130I
Page 2: ......
Page 43: ...42 11 Appendix 11 4 Declaration of Conformity...
Page 44: ...43 11 Appendix...