31
Installation Requirements
1. Minimum Clearance from obstructions is required as shown to ensure that air intake and air
discharge is not blocked as this could affect cooling capacity.
Figure 17 Minimum Clearance required for Unit Installation
2. The location must be level
3. When choosing the installation location, the following must be kept in mind:
a. The flow of the cooling air must not be restricted.
b. Coolant inlet and coolant outlet connections must be easily accessible.
c. Power Cord must be easily accessible.
d. All hoses must be installed without sharp bends.
Summary of Contents for Nextreme NRC1200 Series
Page 1: ...Nextreme Recirculating Chiller Specification and User Manual Part Number 387004848 ...
Page 17: ...17 Component Locations Figure 2 Isometric Views of Unit Figure 3 Top View ...
Page 18: ...18 Figure 4 Front View Figure 5 Rear View Figure 6 Side View ...
Page 39: ...39 Figure 25 Sensor Wiring Low Voltage ...
Page 40: ...40 Plumbing Refrigeration Diagram Figure 26 Plumbing and Refrigeration Diagram ...
Page 43: ...43 Figure 31 Pump Performance of NRC5000 with Cooling Fluids Water and 40 EG W ...
Page 60: ...60 PCFLT Returns FLT fault or NO FAULTS FOUND PCFLT C Clears Fault Returns FLT Faults Cleared ...
Page 69: ...69 Declaration of Conformity ...