17
18.
Position the header against the backboard, and plug in the connector shown.
19.
Hold the header in position and lock in 4 x M6 screws.
20.
Position the backboard against the rear of the playfield.
21.
Sit the backboard on the frame and lock it in place using 8 x M6 screws along the bottom
and 5 x M6 screws along both the left and right side (10 x screws total).
Summary of Contents for Let's Bounce
Page 9: ...9...
Page 10: ...10 PACKING DETAILED...
Page 11: ...11 ASSEMBLY PARTS DETAILED...
Page 48: ...48...
Page 52: ...52...
Page 53: ...53...
Page 54: ...54...
Page 55: ...55...
Page 56: ...56...
Page 57: ...57...
Page 58: ...58...
Page 59: ...59...
Page 60: ...60...
Page 61: ...61...
Page 62: ...62...
Page 63: ...63...
Page 64: ...64...
Page 65: ...65...
Page 66: ...66...
Page 67: ...67...
Page 68: ...68...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71 MECHANICAL ILLUSTRATIONS MAIN ASSEMBLY...
Page 72: ...72 FRONT PANEL...
Page 73: ...73 PANEL DOOR AND BASE FRONT PANEL...
Page 74: ...74 COIN DOOR AND TICKET DOOR...
Page 75: ...75 COIN PLATE WITH DBA AND CASH BOX...
Page 76: ...76 OPERATOR PANEL AND POWER SUPPLY...
Page 77: ...77 PLAYER PANEL...
Page 78: ...78 RIGHT AND LEFT PLAYER PANEL STOPPER...
Page 79: ...79 BALL GATE AND DB BOX...
Page 80: ...80 BALL GATE MOTOR AND DISPLAY SIGN...
Page 81: ...81 BALL LIFTER AND BALL HOPPER CHUTE...
Page 82: ...82 DISPLAY PANEL AND BASE DISPLAY PANEL...
Page 83: ...83 BASE SCORE PANEL...
Page 84: ...84 BOARD DISPLAY ROUND 1 AND BOARD DISPLAY ROUND 2...
Page 85: ...85 RIGHT AND LEFT SIDE WALLS...
Page 86: ...86 MAIN PLAYFIELD...
Page 87: ...87 PEG ASSEMBLY...