
NeoTherm LC Boilers and Water Heaters
Page 79
4. Select that line by pressing it. If you want
to change the DHW priority, the system will
ask you to log in using the installer-level
password. For this kind of installation, the
entry should be “DHW> CH.”
5. Go to the line for “DHW Priority vs Lead
Lag.” For this kind of installation, the entry
should be “DHW> LL.”
6. Remember to change the settings on the other
controller/burner for this boiler.
Setup Type 3 –
The third possibility is to set up a single boiler that just
provides domestic hot water. The model NTV unit is
designed for this kind of “volume water” service. The
water is heated as it moves through the boiler, and that
same water is supplied directly for domestic use. This
is really like a conventional Lead/Lag setup, except
priority is given to domestic hot water, and there is no
input for the central heating function.
• On each boiler which will operate this way,
connect a DHW sensor or the input from the
aquastat to terminals 5 and 6 on TB6. Be
sure there is no thermostat connected (check
terminals 5 and 6 on TB7).
• The two burners in each boiler will operate
in the Lead/Lag mode. You can think of each
boiler as a separate two-burner Lead/Lag
system.
• The setpoint used is the LL DHW setpoint, set
as part of the Lead/Lag system.
• In the Lead/Lag setup, DHW is given priority.
1. Start at the ‘home’ screen (Fig. 116).
Fig. 116 – ‘home’ screen
2. Press the Lead Lag Master button. Fig. 117
shows the screen that follows.
Fig. 117 – Lead/Lag Master Screen
3. Press the Configure button. The display will
present the Lead/Lag Master Configuration
Screen (Fig. 118). Set the DHW setpoint on
this screen.
Fig. 118 – Lead/Lag Master Configuration
4. Press the button for Advanced Settings. This
leads to a “ring” of related screens, and you
can scroll through the list by pressing one of
the left- or right-arrow symbols. Press the
left-arrow or right-arrow until you see the
Domestic Hot Water screen (Fig. 119).
Fig. 119 – Domestic Hot Water
Set the last line to give priority to the DHW
function.
Summary of Contents for NTH1000
Page 4: ...LAARS Heating Systems ...
Page 11: ...NeoTherm LC Boilers and Water Heaters Page 7 Fig 6 Dimensions NT 1700 ...
Page 37: ...NeoTherm LC Boilers and Water Heaters Page 33 Fig 21 Ladder Diagram ...
Page 38: ...LAARS Heating Systems Page 34 Fig 22 Wiring Diagram ...
Page 39: ...NeoTherm LC Boilers and Water Heaters Page 35 ...
Page 51: ...NeoTherm LC Boilers and Water Heaters Page 47 Fig 51 Connection Terminals ...
Page 128: ...LAARS Heating Systems Page 124 Fig 140 Machine Frame NT1000 13 3 Parts Illustrations ...
Page 130: ...LAARS Heating Systems Page 126 Fig 143 Machine Frame NT1700 ...
Page 132: ...LAARS Heating Systems Page 128 Fig 145 Burners and Combustion Chamber NT1000 ...
Page 133: ...NeoTherm LC Boilers and Water Heaters Page 129 Fig 146 Burners and Combustion Chamber NT1700 ...
Page 135: ...NeoTherm LC Boilers and Water Heaters Page 131 Fig 149 Burner Detail NT1700 ...
Page 136: ...LAARS Heating Systems Page 132 Fig 150 Electronic Components Fig 151 Condensate Trap NT1000 ...
Page 138: ...LAARS Heating Systems Page 134 This page intentionally left blank ...
Page 139: ...NeoTherm LC Boilers and Water Heaters Page 135 This page intentionally left blank ...