
23
23
22
TABLE OF CONTENTS
1 – EMPLOYMENT AND STORAGE OF THE INSTALLER/USER GUIDE
25
2 – MACHINE FUNCTION
25
3 – SAFETY DIRECTIONS
25
4 – TECHNICAL DIAGRAM AND SPECIFICATIONS
26
5 – INSTALLATION
27
5.1 – WATER SYSTEM
27
5.2 – ELECTRIC CONNECTION
27
5.3 – GAS CONNECTION
27
5.4 – GAS REGULATION
28
6 – STARTING UP
28
6.1 – PRESSURE SWITCH REGULATION
28
6.2 – PUMP PRESSURE SETTING
29
7 – COFFEE PREPARATION
29
8 – BREWING UNIT CONTROL
30
8.1 – VASARI L MODEL
30
8.2 – VASARI S MODEL
30
8.3 – VASARI SV MODEL
30
9 – COFFEE DOSE PROGRAMMING DIRECTIONS FOR THE VASARI SV MODEL 30
10 – COFFEE DELIVERY
31
10.1 – PRE-INFUSION
31
10.1 – BREWING PRESSURE PROFILING CONTROL
31
11 – HOT WATER WITHDRAWAL
31
12 – PREPARATION OF OTHER DRINKS
31
12.1 – MILK, CAPPUCCINO AND OTHER HOT DRINKS
31
12.2 – TEA, CAMOMILE
31
13 – MAINTENANCE AND CLEANING OPERATIONS
31
13.1 – STEAM DELIVERY NOZZLE CLEANING
31
13.2 – DAILY CLEANING OPERATIONS
31
14 – WEEKLY CLEANING OPERATIONS
31
14.1 – BREWING UNIT AND JET CLEANING
31
14.2 – FILTER AND FILTER-HOLDER CLEANING
32
14.3 – DRAIN TRAY CLEANING
32
14.4 – CASING CLEANING
34
15 – REPLACING THE GROUP GASKET
32
15.1 – VASARI S - SV
32
15.2 – VASARI L
32
16 – BOILER WATER REPLACEMENT
32
17 – USE OF THE SOFTENER
32
18 – MACHINE DEMOLITION
33
19 – CAUSES FOR OPERATING FAILURES OR ANOMALIES (TROUBLESHOOTING) 34
ITALIANO
11 - 22
ENGLISH
23 - 34
FRANÇAIS 35 - 46
DEUTSCH
47 - 58
Summary of Contents for VASARI
Page 1: ... Modello VASARI ...
Page 4: ......
Page 10: ......
Page 12: ...12 ...
Page 24: ...24 ...
Page 36: ...36 ...
Page 48: ...48 ...
Page 59: ...Deutsch 59 ...