Rigging procedures
Procedure
1.
Prepare an enclosure:
a) Remove the relevant placeholder screws.
A
C
B
C
B
A
Risk of acoustic leaks
Do not remove the placeholder screws from the bottom rear inserts (A, B or C) that are not used.
rigging accessory
inter-element angles
used insert
0.25°, 3°
C
2°, 5°, 10°
B
K3i-LINK (connecting from an
enclosure below) / KARAIIi-
DOWNK3i
1°, 4°, 7.5°
A
K3i-RIGBAR
—
B
K3i-TILTBRACKET
5°, 2.5°, 0°, -2.5°, -5°, -7.5°, -10°, -12.5°, -15°
A
It is recommended to use the rigging report from Soundvision to prepare the enclosures.
b) Secure K3i-LINK with the top and middle screws on both sides.
T40
x8
2.
Position K3i-BUMP on top of the enclosure.
K3i owner's manual (EN) version 1.0
41