K1_RM_EN_2-0
w w w . l - a c o u s t i c s . c o m
51
51
51
51
15.
Connect both
front
rigging points between ARRAY#1 and ARRAY#2 as follows:
a.
Slide both KARA#4 front arms up and align them with the KARA#3 bottom front rigging points.
b.
On KARA#3, remove both front bottom R-BLP from the storage holes and secure by re-inserting them into
the bottom
yellow link holes
.
c.
Take the array down until KARA#3 and KARA#4 front corners are in contact (the front arms must remain
vertical).
d.
Secure the front arms on KARA#4 by inserting both top R-BLP into the top
yellow link holes
.
Figure 52: Front rigging point connection between ARRAY#2 and ARRAY#1
16.
Raise the array to a height for which the angle arms of ARRAY#2 are comfortably reachable.
17.
With 2 people working simultaneously on each side of the array, connect both
rear
rigging points between
ARRAY#1 and ARRAY#2 as follows:
a.
Remove the KARA#4 rear top R-BLP from storage position, slide the angle arm so as to align the cursor with
the desired angle value, and secure by re-inserting the R-BLP into the corresponding angle hole (
0°/2°/4°
or
1°/3°/5°/7.5°/10°
).
b.
While grabbing the back handle of KARA#6, rotate ARRAY#2 so as to align the KARA#3 and KARA#4 rear
rigging points.
c.
Remove the rear bottom R-BLP from KARA#3 and secure by re-inserting it into the
yellow link hole
.
Figure 53: Rear rigging point connection between ARRAY#2 and ARRAY#1
18.
Set the inter-enclosure angles in ARRAY#2 by applying step 10.
KARA#4
KARA#3
b.
L
a.
L
c.
KARA#4
a.
b.
d.
KARA#3
c.
Summary of Contents for K1
Page 2: ...w w w l a c o u s t i c s c o m ...
Page 68: ...w w w l a c o u s t i c s c o m ...
Page 69: ...w w w l a c o u s t i c s c o m ...
Page 70: ...w w w l a c o u s t i c s c o m ...