K1
K1
K1
K1
reference wst
reference wst
reference wst
reference wst
®
®
®
®
system
system
system
system
RIGGING PROCEDURES
RIGGING PROCEDURES
RIGGING PROCEDURES
RIGGING PROCEDURES
VERSION 2.0
K1_RM_EN_2-0
w w w . l - a c o u s t i c s . c o m
12
12
12
12
6
6
6
6
INSTALLATION
INSTALLATION
INSTALLATION
INSTALLATION
6.1
K1-BUMP preparation and LA-RAK rigging
6.1.1
K1-BUMP preparation
All along the procedure:
•
Strictly follow the sequence of the successive steps.
•
Systematically ensure that each BLP is fully inserted by pulling on it.
•
Systematically ensure that each shackle anchor has screw bolt secured and safety pin inserted.
1.
Place the K1-BUMP beneath the rigging points with rack rails on top and laser slits towards the front.
Note:
The K1-BUMP can be transported and prepared into the K1BUMP-FLIGHT case [5.3].
2.
Put the central bar from shipping to rigging position:
a.
Remove both shipping
⅜
’’ T-BLP and put them in their storage locations.
b.
Remove both rigging
¾
’’ R-BLP.
c.
Lift up, rotate, and align the central bar with the K1-BUMP holes.
Note:
Two orientations are possible whether the front or rear overhang is required [9.4].
d.
Attach both rigging
¾
’’ R-BLP to the central bar and K1-BUMP holes.
a.
Removing 2 x shipping
⅜
’’ T-BLP
b.
Removing 2 x rigging
¾
’’ R-BLP
c.
Central bar aligned for rear overhang
d.
Attaching 2 x rigging
¾
’’ R-BLP
Figure 6: Putting central bar in rigging position
WARNING
Shipping BLP
storage location
Laser slits
Summary of Contents for K1
Page 2: ...w w w l a c o u s t i c s c o m ...
Page 68: ...w w w l a c o u s t i c s c o m ...
Page 69: ...w w w l a c o u s t i c s c o m ...
Page 70: ...w w w l a c o u s t i c s c o m ...