5
. FUEL SYSTEM
5-9
FLOAT LEVEL INSPECTION
Measure the float level.
Float Level
: 18.5mm
Float Level Gauge
CARBURETOR INSTALLATION
Tighten the drain screw.
Install the carburetor onto the intake
manifold, aligning the tab on the carburetor
with the cutout in the intake manifold.
Tighten the band screw.
Install the air cleaner connecting tube and
tighten the band screw.
Connect the throttle cable to the throttle
wheel on the carburetor.
Connect the fuel tube and vacuum tube to the
carburetor.
Connect the auto bystarter wire connector.
Perform the following inspections and
adjustments:
-Throttle grip free play (
!
3-3)
-Carburetor idle speed (
!
3-6)
Special
Auto Bystarter Wire
Connector
Vacuum Tube
Connecting Tube Band
Throttle Cable
•
Check the operation of the float valve
and float before float level inspection.
•
Measure the float level by placing the
float level gauge on the float chamber
face parallel with the main jet.
*
Float Level Gauge
Summary of Contents for 125 MOVIE S INJECTION
Page 28: ...2 FRAME COVERS EXHAUST MUFFLER 2 0 2FRAME COVERS LAYOUT 2 ...
Page 55: ...5 FUEL SYSTEM 5 0 5 FUEL SYSTEM 5 ...
Page 69: ...6 ENGINE REMOVAL INSTALLATION 6 0 6 6 4 0kg m 7 0kg m ...
Page 74: ...7 CYLINDER HEAD VALVES 7 0 7 7 0 8kg m 1 2kg m 2 0kg m ...
Page 90: ...8 CYLINDER PISTON 8 0 8 8 Do not bend ...
Page 98: ...9 DRIVE AND DRIVEN PULLEYS KICK STARTER 9 0 9 5 5kg m 5 5kg m 5 5kg m ...
Page 116: ...10 FINAL REDUCTION 10 0 10 ...
Page 123: ...11 CRANKCASE CRANKSHAFT 11 0 11 ...
Page 130: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 0 12 4 5kg m 0 9kg m 4 5kg m ...
Page 139: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 9 HYDRAULIC BRAKE DRAWING ...