19
. EXHAUST EMISSION CONTROL
SYSTEM
19-5
AIR INJECTION CUT-OFF
VALVE (A.I.C.V.)
REMOVAL
1. Remove the front right side cover. (
!
2-4)
2. Disconnect all the tubes that go to the air
injection cut-off valve.
3. Remove the air injection cut-off valve.
INSPECTION
1. Inspect the air injection cut-off valve
flow using a vacuum pump. If the flow is
not within the specified values, replace
with a new one.
2. The flow should be at least 30 liter/min
when a vacuum of 250mm/Hg is applied.
3. The flow should be at least 1.6 liter/min
when a vacuum of 320mm/Hg is applied.
4. Check each connecting tube for cracks or
damage and replace if necessary.
INSTALLATION
1. The installation sequence is the reverse of
removal.
•
When installing, be careful not to bend or twist the tubes
and check for proper installation.
•
The tube length is very important to its performance, use
the tube of same specification for replacement.
*
Vacuum Tube
Bolt
Air Injection Cut-off Valve
Vacuum Pump
Tube to Reed Valve
Air Inlet Tube
Air Injection Cut-off Valve
Summary of Contents for 125 MOVIE S INJECTION
Page 28: ...2 FRAME COVERS EXHAUST MUFFLER 2 0 2FRAME COVERS LAYOUT 2 ...
Page 55: ...5 FUEL SYSTEM 5 0 5 FUEL SYSTEM 5 ...
Page 69: ...6 ENGINE REMOVAL INSTALLATION 6 0 6 6 4 0kg m 7 0kg m ...
Page 74: ...7 CYLINDER HEAD VALVES 7 0 7 7 0 8kg m 1 2kg m 2 0kg m ...
Page 90: ...8 CYLINDER PISTON 8 0 8 8 Do not bend ...
Page 98: ...9 DRIVE AND DRIVEN PULLEYS KICK STARTER 9 0 9 5 5kg m 5 5kg m 5 5kg m ...
Page 116: ...10 FINAL REDUCTION 10 0 10 ...
Page 123: ...11 CRANKCASE CRANKSHAFT 11 0 11 ...
Page 130: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 0 12 4 5kg m 0 9kg m 4 5kg m ...
Page 139: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 9 HYDRAULIC BRAKE DRAWING ...