12
. FRONT WHEEL/FRONT BRAKE/
FRONT SUSPENSION
12-3
FRONT WHEEL
REMOVAL
Jack the motorcycle front wheel off the
ground.
Remove the speedometer cable set screw and
disconnect the speedometer cable.
Remove the front brake cable.
Remove the front axle nut and pull out the
axle.
Remove the front wheel.
Remove the front brake panel.
INSPECTION
AXLE RUNOUT
Set the axle in V blocks and measure the
runout using a dial gauge.
The actual runout is 1/2 of the total indicator
reading.
Service Limit
: 0.2mm replace if over
WHEEL RIM
Check the wheel rim runout.
Service Limits
:
Radial
: 2.0mm replace if over
Axial
: 2.0mm replace if over
Screw
Speedometer Cable
Front Brake Cable
Axle Nut
Axle Shaft
Summary of Contents for 125 MOVIE S INJECTION
Page 28: ...2 FRAME COVERS EXHAUST MUFFLER 2 0 2FRAME COVERS LAYOUT 2 ...
Page 55: ...5 FUEL SYSTEM 5 0 5 FUEL SYSTEM 5 ...
Page 69: ...6 ENGINE REMOVAL INSTALLATION 6 0 6 6 4 0kg m 7 0kg m ...
Page 74: ...7 CYLINDER HEAD VALVES 7 0 7 7 0 8kg m 1 2kg m 2 0kg m ...
Page 90: ...8 CYLINDER PISTON 8 0 8 8 Do not bend ...
Page 98: ...9 DRIVE AND DRIVEN PULLEYS KICK STARTER 9 0 9 5 5kg m 5 5kg m 5 5kg m ...
Page 116: ...10 FINAL REDUCTION 10 0 10 ...
Page 123: ...11 CRANKCASE CRANKSHAFT 11 0 11 ...
Page 130: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 0 12 4 5kg m 0 9kg m 4 5kg m ...
Page 139: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 9 HYDRAULIC BRAKE DRAWING ...