19
. EXHAUST EMISSION CONTROL
SYSTEM
19-6
REED VALVE
REMOVAL
1. Remove the frame center cover.
2. Remove the floor board.
3. Disconnect the secondary air inlet tube
connector.
4. Remove the four cylinder head cover
bolts and two secondary air outlet tube
bolts.
INSPECTION
1. Remove the two bolts attaching the reed
valve cover and the reed valve.
2. Check the reed valve for cracks, damage,
big clearance or weak reeds. Replace if
necessary.
3. Check the gasket and O-ring for damage
or deterioration and replace if necessary.
4. Reed valve stopper clearance: 4.6mm
INSTALLATION
Install the reed valve in the reverse order of
removal.
•
When installing, be careful not to bend
or twist the tubes and check for
proper installation.
*
Cylinder Head Cover Bolts
Bolt
Secondary Air Inlet
Tube Bolt
Reed Valve Cover Bolts
Reed Stopper
Summary of Contents for 125 MOVIE S INJECTION
Page 28: ...2 FRAME COVERS EXHAUST MUFFLER 2 0 2FRAME COVERS LAYOUT 2 ...
Page 55: ...5 FUEL SYSTEM 5 0 5 FUEL SYSTEM 5 ...
Page 69: ...6 ENGINE REMOVAL INSTALLATION 6 0 6 6 4 0kg m 7 0kg m ...
Page 74: ...7 CYLINDER HEAD VALVES 7 0 7 7 0 8kg m 1 2kg m 2 0kg m ...
Page 90: ...8 CYLINDER PISTON 8 0 8 8 Do not bend ...
Page 98: ...9 DRIVE AND DRIVEN PULLEYS KICK STARTER 9 0 9 5 5kg m 5 5kg m 5 5kg m ...
Page 116: ...10 FINAL REDUCTION 10 0 10 ...
Page 123: ...11 CRANKCASE CRANKSHAFT 11 0 11 ...
Page 130: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 0 12 4 5kg m 0 9kg m 4 5kg m ...
Page 139: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 9 HYDRAULIC BRAKE DRAWING ...