18
. EVAPORATIVE EMISSION CONTROL
SYSTEM
18-4
SERVICE INFORMATION
GENERAL INSTRUCTIONS
•
Do not smoke or allow flames or sparks near the working area.
•
Note the locations of tubes for proper installation.
•
Replace any damaged tube with a new one.
•
Make sure to tighten the connector of each tube securely.
•
Install the charcoal canister with the drain hole facing down.
TOOLS
•
Vacuum pump
-
•
Pressure pump
-
SPECIFICATIONS
Purge control valve vacuum pressure
45mm/Hg
Charcoal canister capacity
90cc
Charcoal canister installation angle
tilt 60
°
Summary of Contents for 125 MOVIE S INJECTION
Page 28: ...2 FRAME COVERS EXHAUST MUFFLER 2 0 2FRAME COVERS LAYOUT 2 ...
Page 55: ...5 FUEL SYSTEM 5 0 5 FUEL SYSTEM 5 ...
Page 69: ...6 ENGINE REMOVAL INSTALLATION 6 0 6 6 4 0kg m 7 0kg m ...
Page 74: ...7 CYLINDER HEAD VALVES 7 0 7 7 0 8kg m 1 2kg m 2 0kg m ...
Page 90: ...8 CYLINDER PISTON 8 0 8 8 Do not bend ...
Page 98: ...9 DRIVE AND DRIVEN PULLEYS KICK STARTER 9 0 9 5 5kg m 5 5kg m 5 5kg m ...
Page 116: ...10 FINAL REDUCTION 10 0 10 ...
Page 123: ...11 CRANKCASE CRANKSHAFT 11 0 11 ...
Page 130: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 0 12 4 5kg m 0 9kg m 4 5kg m ...
Page 139: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 9 HYDRAULIC BRAKE DRAWING ...