5
. FUEL SYSTEM
5-8
ASSEMBLY
Install the slow jet, needle jet, needle jet
holder, main jet and pilot screw.
Standard Opening
: 3
±
1
/
2
turns
Install the float valve, float and float pin.
Float Valve
Return the pilot screw to the original
position as noted during removal.
*
Float Pin
Pilot Screw
Slow Jet
Main Jet
Needle Jet Holder
Needle Jet
Summary of Contents for 125 MOVIE S INJECTION
Page 28: ...2 FRAME COVERS EXHAUST MUFFLER 2 0 2FRAME COVERS LAYOUT 2 ...
Page 55: ...5 FUEL SYSTEM 5 0 5 FUEL SYSTEM 5 ...
Page 69: ...6 ENGINE REMOVAL INSTALLATION 6 0 6 6 4 0kg m 7 0kg m ...
Page 74: ...7 CYLINDER HEAD VALVES 7 0 7 7 0 8kg m 1 2kg m 2 0kg m ...
Page 90: ...8 CYLINDER PISTON 8 0 8 8 Do not bend ...
Page 98: ...9 DRIVE AND DRIVEN PULLEYS KICK STARTER 9 0 9 5 5kg m 5 5kg m 5 5kg m ...
Page 116: ...10 FINAL REDUCTION 10 0 10 ...
Page 123: ...11 CRANKCASE CRANKSHAFT 11 0 11 ...
Page 130: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 0 12 4 5kg m 0 9kg m 4 5kg m ...
Page 139: ...12 FRONT WHEEL FRONT BRAKE FRONT SUSPENSION 12 9 HYDRAULIC BRAKE DRAWING ...