Table of contents
3
Table of contents
Preface ......................................................
4
Target group for this operating manual
4
Symbols used
4
Terminology used
5
Safety .........................................................
6
Safety decals
6
General safety information
8
Getting to know the plough .....................
11
Proper use
11
Features
11
Components
12
Technical specifications
14
Information plate
17
Optional equipment ..................................
18
Preparing for operation ............................
23
Tractor
23
Remove paint
24
Coupling ....................................................
25
Safety
25
Coupling
25
Linkage geometry
26
Clearance between the depth wheel/
plough and ground
26
Clearance between the tractor and
plough
26
Transport ...................................................
27
Safety
27
Place in the transport position
28
Place in ploughing position
30
Adjusting the plough ................................
32
Safety
32
Working width - Incremental
33
Working width - Variomat
34
First furrow width
35
Working depth
36
Levelling
37
Disc coulter [+]
38
Skimmer [+]
40
Trashboard [+]
41
Trailed packer arm [+]
42
Ploughing ..................................................
43
Safety
43
Prior to ploughing
43
Checks during ploughing
43
Turn the plough
44
Maintenance and care ..............................
45
Safety
45
Prior to maintenance
45
Maintenance chart
46
Cleaning
46
Lubrication
47
Replace hoses
50
Replace wearing parts
50
Replacing Quick- fit points
51
Replacing Knock-on® points
51
Tighten bolts and nuts
52
Tightening torque of the hydraulic
connections
52
Replace the shear bolt [150 B]
53
Check the spring is the correct length
[150 S]
53
Tyre pressure
54
Align bodies
54
Possible modifications .............................
55
The spring release system [150 S]
55
Adjust the switching pressure in the
turning valve
59
The position of the cross shaft
60
Parking and storage ..................................
61
Safety
61
Parking and storage
61
Ploughs with Eco-shares [+]
61
Troubleshooting ........................................
62
Checklist ....................................................
63
Disposal of the plough ..............................
64
EC Declaration of conformity ...................
65