MAINTENANCE SCHEDULE
DAILY
1. Blow off dust from entire machine.
2. Lubricate
linear
bearings and chrome shaft with silicone.
3. Wipe down machine
4. Check tooling for wear
5. Empty water filter bowl if not a self draining system
6. Photo eyes should be wiped off and checked to ensure that all fastening rings are snug.
7. Check the air pressure
8. Check the Chip-Out blocks for wear.
9. Refill lubricator with proper type of oil (see lubrication requirements)
WEEKLY
1. Check machine for smooth motion through a complete cycle.
2. Clean linear bearings and chrome shaft, then lubricate.
3. Check air pressure to and on the machine
4. Adjust and lock flow controls.
5. Check all air lines & electrical wiring for kinks or rubbing.
MAY AND DECEMBER CHECK UPS
1. Wash filter and lubricator bowls with soapy water.
2. Grease all bearings and tighten all bolts.
3. Clean and lubricate all slides and cylinder rods with dry silicone spray.
* Carburetor cleaner can be used to remove pitch. If carburetor cleaner is used, re-lubricate
the affected surface.
Summary of Contents for DL-2
Page 1: ...KVAL INC Instructions Manual DL 2 Door Light Cutout ...
Page 4: ......
Page 20: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 33: ......
Page 34: ......
Page 38: ......
Page 40: ......
Page 44: ......
Page 51: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ...Notes ...
Page 67: ...Notes ...