![Kval 990-H Operation Manual Download Page 77](http://html.mh-extra.com/html/kval/990-h/990-h_operation-manual_2012802077.webp)
Pre-Drill
See “How to Enter Calibration Data” on page
instructions to enter calibration data.
Pre-Drill:
Adjustments tune the point-to-point drill in the X, Y,
and Z direction.
Each pre-drill hole moves the distance in the direction entered
in the entry box.
This adjustment moves the Pre-Drills only, the chisels and the
router will stay in the same position.
Jamb
Door
X:
+
Offset
Y:
+
Offset
X:
-
Offset
Y:
-
Offset
Z: positive Offset plunges IN
Z: negative Offset retracts Out
Setup Hinges 1-3 Screens
KVAL 990-H Operation Manual
2-48
Summary of Contents for 990-H
Page 4: ...KVAL 990 H Operation Manual ...
Page 8: ...990 H Table of Contents ...
Page 29: ...Safety Sign Off Sheet 1 21 KVAL 990 H Operation Manual ...
Page 83: ...Status of I O and E Stops Screen KVAL 990 H Operation Manual 2 54 ...
Page 86: ......
Page 87: ......