
Powering Operations for the 990-H
2-25
KVAL 990-H Operation Manual
Powering Operations for the 990-H
This section describe how to power up and to power down the 990-H.
Powering up the system includes:
• Applying power to the entire system
• Starting the Control Circuit
Powering down the system includes:
• Shutting down the control power
• Removing power from the entire system
How to Power Up the 990-H
1.
Ensure factory air is applied to machine and main air supply is turned on.
2.
Make sure all E-Stop buttons are out.
Note:
The E-Stop Indicator Button on the main screen will alert the operator if an E-
Stop is activated.
3.
Make sure the electrical disconnect the electrical cabinet is turned to the ON posi-
tion.
Move the Feeder, 990-H, and the feeder C
ONTROL
TRANSFORMER
switches to the ON position. they all
should light up.
Note:
Boot up may take 2 to 3 minutes.
Note:
Refer to the Feeder/Stacker manual for informa-
tion specific about these machines
4.
Push all the green
START MACHINE b
uttons.
5.
Wait for the machine feedback on the operator
screen displays “
Ready to Home
”.
6.
All lights on the status light panel on the electrical box
should be illuminated.
See “Description of the Six Light
.
Summary of Contents for 990-H
Page 4: ...KVAL 990 H Operation Manual ...
Page 8: ...990 H Table of Contents ...
Page 29: ...Safety Sign Off Sheet 1 21 KVAL 990 H Operation Manual ...
Page 83: ...Status of I O and E Stops Screen KVAL 990 H Operation Manual 2 54 ...
Page 86: ......
Page 87: ......