Troubleshooting Electrical Problems
5-11
KVAL 979-2 Operation/Service Manual
If one or more lights are OFF, follow the process below to isolate the cause.
NOTE
: Be sure to proceed down the table, starting with the CONTROL POWER light.
STEP 1:Control Power (Amber). If light is OFF go to item
A
STEP 2:Overload Relay (Amber) If light is OFF go to item
B
STEP 3:E-Stop (Amber) If light is OFF go to item
C
STEP 4: Stop (Amber) If light is OFF go to item
D
STEP 5: Start (Amber) If light is OFF go to item
E
STEP 6: 24VDC (Green light is OFF go to item
F
The sequence that the lights turn on are
as follows:
1.
Control Power (Amber)
2.
Overload Relay (Amber)
3.
E-Stop (Amber)
4.
Stop (Amber)
5.
Start (Amber)
6.
24VDC (Green)
Summary of Contents for 979-2
Page 4: ...KVAL 979 2 Operation Service Manual ...
Page 8: ...979 2 Miter Trim Saw System ...
Page 23: ...Getting Help from KVAL 1 15 KVAL 979 2 Operation Service Manual Page Intentionally Left Blank ...
Page 25: ...Safety Sign Off Sheet 1 17 KVAL 979 2 Operation Service Manual ...
Page 60: ...Notes ...
Page 64: ...System IT Administration 3 4 KVAL 979 2 Operation Service Manual ...
Page 86: ...Mechanical Adjustments 4 22 KVAL 979 2 Operation Service Manual ...
Page 105: ...Notes ...
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......