KVAL 979-2 Operation / Service Manual
1
A
air input system
description
lubricator
air line lubricator
adjusting
priming
air line lubricator, maintenance schedule
B
back section group
description
back section status
feedback
ball screw, maintenance schedule
Beckhoff® CPU module
C
computer
as a PLC
backing up
control panel light
not on? troubleshoot
control power indicator light description
control transformer switch
power up
D
diagnostic screen
description
dura-lith grease, bearing lube
DVI/USB module location
E
electrical panels
description
emergency shutdown
description
e-stop light
description
EtherCat®
smart power supply
terminals,location
ethernet module
connection to servo amplifiers
F
flange block bearing, maintenance schedule
front section status
feedback
G
gear box, maintenance schedule
H
hinge spec group
description
home button
description user interface
using
I
inductive proximity sensor
internet access
location of connection
remote connection
RJ45 to intranet
intranet
RJ45 connection
K
KVAL, getting help
L
LCD display
smart power supply
linear bearing, maintenance schedule
lockout and tagout Guidelines
lockout procedure
lubrication schedule, bearings
M
machine feed back
user output
machine feedback
front section status
general
servo positons
machine status
general feedback
main cal screen
Index
Summary of Contents for 979-2
Page 4: ...KVAL 979 2 Operation Service Manual ...
Page 8: ...979 2 Miter Trim Saw System ...
Page 23: ...Getting Help from KVAL 1 15 KVAL 979 2 Operation Service Manual Page Intentionally Left Blank ...
Page 25: ...Safety Sign Off Sheet 1 17 KVAL 979 2 Operation Service Manual ...
Page 60: ...Notes ...
Page 64: ...System IT Administration 3 4 KVAL 979 2 Operation Service Manual ...
Page 86: ...Mechanical Adjustments 4 22 KVAL 979 2 Operation Service Manual ...
Page 105: ...Notes ...
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......