Shredders
34
BKE 280-305 SUPER
Putting into service
2. Coupling the machine
Check that tractor PTO rotates clockwise.
- Lower the tractor three-point linkage.
- Place the lower links as close as possible under the
hitch pins.
- Attach the lower links to the hitch pins (1).
- Secure with lynch pins.
- Attach top link (2).
- Lock the upper hitch attachment using lynch pin (3).
- Lift the machine using the tractor's lift linkage.
Hydraulic connection
Connect hydraulic hoses (a) and (b) to the same
hydraulic double acting outlet.
The input machine rotation direction must
correspond to the tractor PTO rotation
direction.
Summary of Contents for BKE 280 SUPER
Page 1: ...JN033AGB A OPERATOR S MANUAL Shredders BKE 280 305 SUPER JN033AGB A English 05 2010...
Page 2: ......
Page 66: ...Shredders 64 BKE 280 305 SUPER Appendix T Axle loads Tractor only...
Page 68: ...Shredders 66 BKE 280 305 SUPER Limited warranty Limited warranty...
Page 69: ...Limited warranty Shredders BKE 280 305 SUPER 67...
Page 70: ......
Page 71: ......
Page 72: ......