
Putting into service
Shredders
BKE 280-305 SUPER
31
- Remove pulley (A).
- Repeat procedure on pulley (B).
- Invert and reinstall pulleys (A) and (B).
- Reinstall T-clamp (12) of pulley (A).
- Reinstall the 7 bolts (10).
- Tighten screws (10)
• Torque: 4,2 daNm (31 lbf ft).
- Reinstall T-clamp (12) of pulley (B).
Summary of Contents for BKE 280 SUPER
Page 1: ...JN033AGB A OPERATOR S MANUAL Shredders BKE 280 305 SUPER JN033AGB A English 05 2010...
Page 2: ......
Page 66: ...Shredders 64 BKE 280 305 SUPER Appendix T Axle loads Tractor only...
Page 68: ...Shredders 66 BKE 280 305 SUPER Limited warranty Limited warranty...
Page 69: ...Limited warranty Shredders BKE 280 305 SUPER 67...
Page 70: ......
Page 71: ......
Page 72: ......