Putting into service
Shredders
BKE 280-305 SUPER
29
$
Putting into service
1. Coupling and uncoupling
Description of coupling elements
- A PTO shaft 1 3/8’’ - 6 splines (1).
- Attachment configuration category 2.
Preparing the tractor
The tractor PTO must rotate at a speed of 540 min
-1
or
1000 min
-1
.
Hitch pin parallelism
Adjust tractor lift rods so that hitch pins are parallel to the
ground.
Lateral adjustment of the lower links
Balance the play on either sides of the lift linkage and
lock lower link stabilizers.
The tractor must be fitted with lower link
stabilizers.
Summary of Contents for BKE 280 SUPER
Page 1: ...JN033AGB A OPERATOR S MANUAL Shredders BKE 280 305 SUPER JN033AGB A English 05 2010...
Page 2: ......
Page 66: ...Shredders 64 BKE 280 305 SUPER Appendix T Axle loads Tractor only...
Page 68: ...Shredders 66 BKE 280 305 SUPER Limited warranty Limited warranty...
Page 69: ...Limited warranty Shredders BKE 280 305 SUPER 67...
Page 70: ......
Page 71: ......
Page 72: ......