Shredders
32
BKE 280-305 SUPER
Putting into service
- Using a ruler, check that pulleys are in line (8).
- Reinstall the 7 bolts (10).
- Tighten screws (10)
• Torque: 4,2 daNm (31 lbf ft).
- Reinstall belts (9).
- Turn the adjustment screws (6) and nuts (7) equally
until reaching the optimum tension.
- Tighten screws (3) and (4).
- Tighten counter nut (5).
By adjusting (6) and (7) equally, the central
transmission shaft is kept parallel to the rotor.
Summary of Contents for BKE 280 SUPER
Page 1: ...JN033AGB A OPERATOR S MANUAL Shredders BKE 280 305 SUPER JN033AGB A English 05 2010...
Page 2: ......
Page 66: ...Shredders 64 BKE 280 305 SUPER Appendix T Axle loads Tractor only...
Page 68: ...Shredders 66 BKE 280 305 SUPER Limited warranty Limited warranty...
Page 69: ...Limited warranty Shredders BKE 280 305 SUPER 67...
Page 70: ......
Page 71: ......
Page 72: ......