Before operation
69
7
7.15
Carrying out a spreading test above a working width of 24 m
As shown in the diagram position all ten collection bowls at even distances
apart. Place two collection bowls in the centre of the track, one in the overlap
zone and one exactly between.
Figure 7.26:
Lateral distribution
Set the attachment height of the spreader at an equal height on the left and
right spreader sides as specified in the spreader table. Make sure that the
mounting height includes the top edge of the trays.
Check the completeness and status of the spreading components (broadcast
discs, vanes, discharge).
Run broadcast test and adjust and lock left and right metering slide. Run
spread test with the openings set as calculated for the job. If the amount in
the collection bowls needs to be increased, the run is repeated and the open-
ing adjustment is not changed. Select a speed between 3 and 4 km/h so the
tractor and spreader run smoothly.
Travel over tracks in succession. Open the metering slides approx. 10 m be-
fore the collection bowls and close them approx. 40 m after. If the quantity in
the trays is too low, repeat the run.
Pour the contents of the trays into the measuring tube from the left. The qual-
ity of the cross-spreading can be easily read in the 5 sight glasses.
NOTICE
Set the trays horizontally. Slanted trays may cause measurement errors .
1/2x
x
1/4x
Summary of Contents for AXIS H 30.1 EMC
Page 2: ......
Page 4: ......
Page 10: ...Intended use 1 2 ...
Page 36: ...Technical data 4 28 ...
Page 40: ...Axle load calculation 5 32 ...