Before operation
7
68
Run casting test with the openings set as calculated for the job.
Ground speed: select
3 - 4 km/h
.
Open metering slide
10 m before
the catch trays.
Close metering slides approx.
30 m after
the catch trays.
NOTICE
If the quantity in the trays is too low, repeat the run.
Do not change the adjustment of the metering slide.