
Section 5
Service Procedures
72183211
8-2016/Rev 01
ORIGINAL INSTRUCTIONS
5-44
1.
Using two 7/8-inch combination wenches, loosen and remove the four cap nuts and
remove the four tie rod extensions.
2.
Remove the fill plug from the piston and drain the transmission fluid. Discard the used
transmission fluid.
Figure 5-22: Pressure Loading Tool Disassembly
3.
Loosen the hex nut and remove the pressure gauge.
4.
Remove the piston from the tool cap bore, and
remove and discard the existing backup ring and o-
ring.
5.
Place the plunger hex in a soft jaw vise with the
piston bore facing up.
Figure 5-23: Plunger Removal
6.
Remove and retain the screw and the stop cap from the bore.