
Section 4
Operation
72183204
8-2016/Rev 01
ORIGINAL INSTRUCTIONS
4-2
Figure 4-2: Display with Optional Dual Pressure
Control is changed from the local panel to remote controls using the
keyed switch on the electrical enclosure.
4.2
Preparing the Pump for Startup
After initial installation
Before the beginning of each shift
After the installation of on the maintenance kits
Follow this procedure to ensure the pump if ready for operation.
1.
Flush debris from all water supply lines before connecting them to the pump.
Debris in the water supply line can cause extensive damage to high pressure
components.
2.
Fill the pump case with the recommended oil. Fill the oil reservoir to the fill mark.