11
SERVICE WORK ON THE CHASSIS
45
11.12
Adjusting the play of the steering head bearing
x
Preparatory work
–
Raise the motorcycle with the lift stand. (
–
Remove the handlebar cushion.
B02093-10
Main work
–
Loosen screws
. Remove screw
.
–
Loosen and retighten screw
.
Guideline
Screw, top steering head
M20x1.5
12 Nm (8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
17 Nm
(12.5 lbf ft)
–
Mount and tighten screw
.
Guideline
Screw, top steering stem
M8
17 Nm
(12.5 lbf ft)
Loctite
®
243™
Finishing work
–
Check the play of the steering head bearing. (
–
Remove the motorcycle from the lift stand. (
–
Mount the handlebar cushion.
11.13
Greasing the steering head bearing
x
800010-10
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
11.14
Removing the start number plate
L00947-10
–
Remove screw
and take off the clamp.
–
Remove screw
. Take off the start number plate.
Summary of Contents for 125 SX EU 2015
Page 2: ......