
- 25 -
4.5.6.1 Smoke fan startup.
To ensure that no smoke comes out in connection with the startup, it is possible to decide for how long
the smoke fan shall start before the fans on the boiler.
Please select:
Menu / Accessories / Smoke fan / Smoke fan startup
10 seconds is appropriate startup time for the smoke fan.
4.5.6.2 Smoke fan 100, 60, 40, 30 and 20.
This option is not used at the moment.
4.5.7 Hydraulic moving floor.
If the plant is mounted with hydraulic moving floor, it is possible to adjust the run time so it fits the time
of the screw to avoid overfeeding.
And if you have two Hydraulic moving floors placed in its own stockpile, it is possible to mix the fuel as
desired.
4.5.7.1 Hydraulic moving floor 1 in %.
The Hydraulic moving floor has a cycle on 10 seconds and if set to 50 % means that the Hydraulic
moving floor is operating in 5 seconds and is in pause in 5 seconds.
Please select:
Menu / Accessories / Hydraulic moving floor / Hydraulic moving floor 1 %
This function demands special valves on the pump station.
4.5.7.2 Hydraulic moving floor 2 in %.
This function has the same options as Hydraulic moving floor 1. If you operate Hydraulic moving floor 1
by 70 % then will Hydraulic moving floor 2 operate by 30 % which means that the fuel is mixed with
approximately 70-30.
Please select:
Menu / Accessories / Hydraulic moving floor / Hydraulic moving floor 2 %
4.5.8 Lime dosage %.
Especially when using grain and grain waste as fuel it is an advantage to add calcium. The value which is
inserted is the calcium dispenser’s run time in % of the boiler’s run time.
Please select:
Menu / Accessories / Lime dosage %
Start with 5 % and then go a little up and down until you have found the setting which gives the least
clinker generation.