5 Installation at Site
30 of 74
HPK-L
1136.8/15-EN
B
A
A
B
1
1
2
2
1
2
2
Fig. 16:
Double Cardan spacer-type coupling, checking the coupling alignment
1
Straight edge
2
Gauge
Table 11:
Permissible alignment offset of coupling halves
Coupling type
Radial offset
Axial offset
[mm]
[mm]
≤ 0,1
≤ 0,1
Spacer-type coupling (
≤ 0,1
≤ 0,1
Double Cardan coupling (
≤ 0,5
≤ 0,5
ü
The coupling guard and its footboard, if any, have been removed.
1. Loosen the support foot and re-tighten it without transmitting any stresses and
strains.
2. Place the straight edge axially on both coupling halves.
3. Leave the straight edge in this position and turn the coupling by hand.
The coupling is aligned correctly if the distances A and B to the respective shafts
are the same at all points around the circumference.
Observe the permissible radial offset in coupling half alignment (
both during standstill and at operating temperature as well as under inlet
pressure.
4. Check the distance (dimension see general arrangement drawing) between the
two coupling halves around the circumference.
The coupling is correctly aligned if the distance between the two coupling
halves is the same at all points around the circumference.
Observe the permissible axial offset in coupling half alignment (
both during standstill and at operating temperature as well as under inlet
pressure.
5. If alignment is correct, re-install the coupling guard and its footboard, if any.
Checking the coupling alignment with a laser tool
Coupling alignment may also be checked with a laser tool. Observe the
documentation provided by the manufacturer of the measuring instrument.
5.6 Aligning the pump and motor
After having installed the pump set and connected the piping, check the coupling
alignment and, if required, re-align the pump set (at the motor).
Summary of Contents for HPK-L
Page 1: ...Thermal Oil Hot Water Pump HPK L Installation Operating Manual ...
Page 72: ......
Page 73: ......