At least 1 m of space must be provided in front of the device for control and servicing purposes.
If the air is drawn from the room device is located, the volume of the room must be at least
30 m
3
.
5.2 Levelling of the device
CAUTION
During operation, the device has to be placed in a vertical position to prevent
eventual saturation of the water condensate.
Picture 6: Levelling of the device
The device has a level bottom. For correct installation, the device requires a level and solid
surface. We recommend making a pedestal for the device (1-2 cm high) and thus preventing
eventual water saturating the insulation of the buffer tank for DHW.
The surface on which the device is laid must be level. Thus we ensure the device is levelled
on all sides. Otherwise, unwanted overflow of condensate can occur in the collecting vessel.
5.3 Hydraulic connection
The hydraulic connection has to be installed in accordance with the national and local
regulations for connecting buffer tanks for DHW in force. The room the device is installed in
must have a drain on the floor below the level of the device in case of water leakage. The
following picture shows the correct hydraulic connection of the device.
If the heat conductor (for heated water) in the buffer tank for DHW will not be used for heating
water, it must be filled with antifreeze liquid to prevent corrosion in the conductor. Close the
filled conductor only on the bottom side (equalisation of pressure because of temperature