![Krone Round Pack 1250 Original Operating Instructions Download Page 55](http://html1.mh-extra.com/html/krone/round-pack-1250/round-pack-1250_original-operating-instructions_2004825055.webp)
V - 21
Basic Settings and Operation
Insert the netting (3) over the guide shaft (1) below the
net stretcher bar (2) between the rubber-coated roller (4)
and the pressure roller (5). The netting should extend
0 - 50 mm above the scraper, the conveying roller or blade
rotor.
• Pull the flat iron (1) forward.
• Fold the net stretcher bar (2) downwards and engage.
Once installed, the netting roll can be aligned to the right
and left in the centre to the machine using the mounting
lever (2).
To pull the netting, release the brake. To do this press
lever (1) downwards.
Place the net brake callipers (3) below the netting roll.
5.7.5 Setting the Net Brake
In the basic setting, the tensioning bolt dimension should
be
a = 35 mm
.
If the netting gets caught up during baling,
then tension must be increased on the
spring (1) of the net brake.
The brake spring (1) can be tightened at the eye bolt (2).
If the netting does not feed correctly at the start,
pressure roller tension can be increased by adjusting
the spring (3).
RBV04041
2
1
1
2
RBV00111
3
RP-99-002
1
3
2
a
3
0 - 50 mm
4
5
2
1
VP-3-008
Summary of Contents for Round Pack 1250
Page 20: ...II 10 Safety ...
Page 34: ...IV 6 Use ...
Page 61: ...V 27 Basic Settings and Operation ...
Page 62: ...V 28 Basic Settings and Operation ...
Page 84: ...VIII 16 Control unit Comfort ...
Page 96: ...IX 12 Maintenance VP100101 1 Z 2a 9 H L 4 a1 11 12 I II 5 3 3 2b a2 H L 6 Z m in 0 2a 2b 7 7 ...
Page 111: ...IX 27 Maintenance ...
Page 112: ...IX 28 Maintenance ...
Page 114: ...X 2 Winter Storage ...
Page 122: ...XII 6 Faults Causes and Remedy ...
Page 134: ...A 12 Appendix ...
Page 135: ...A 13 Appendix ...