![Krone Round Pack 1250 Original Operating Instructions Download Page 123](http://html1.mh-extra.com/html/krone/round-pack-1250/round-pack-1250_original-operating-instructions_2004825123.webp)
A - 1
Appendix
A1 Commissioning
A1.1 Preparing for Commissioning
Due to transport considerations, the PTO shaft and straw trap are not attached to the round baler at delivery.
The round baler needs to be fully assembled prior to commissioning and adjusted to the type of tractor used.
The following parts are packed separately at delivery. The words in parentheses indicate) the storage location
on the machine during transport.
1 spray paint can
(twine box)
2 PTO shaft
(bale chamber)
3 PTO shaft support bracket
(twine box)
4 hose and cable retainer
(bale chamber)
5 fasteners
(twine box)
6 feeler wheels
(bale chamber)
7 guard cup
(twine box)
8 PTO shaft holder
(twine box)
RP-B-010_1
2
4
5
3
1
6
8
7
Summary of Contents for Round Pack 1250
Page 20: ...II 10 Safety ...
Page 34: ...IV 6 Use ...
Page 61: ...V 27 Basic Settings and Operation ...
Page 62: ...V 28 Basic Settings and Operation ...
Page 84: ...VIII 16 Control unit Comfort ...
Page 96: ...IX 12 Maintenance VP100101 1 Z 2a 9 H L 4 a1 11 12 I II 5 3 3 2b a2 H L 6 Z m in 0 2a 2b 7 7 ...
Page 111: ...IX 27 Maintenance ...
Page 112: ...IX 28 Maintenance ...
Page 114: ...X 2 Winter Storage ...
Page 122: ...XII 6 Faults Causes and Remedy ...
Page 134: ...A 12 Appendix ...
Page 135: ...A 13 Appendix ...