INSTALLATION
3
11
OPTISWIRL 5080
www.krohne.com
07/2020 - 4008054001 - AD OPTISW5080 Exd Gb-Db en R01
3.1 Mounting
Installation and setup must be carried out according to the applicable installation standards
(e.g. EN 60079-14) by qualified personnel trained in explosion protection.
The information given in the manual and these instructions must always be observed.
Vortex flowmeters must be installed in such a way that
•
no external forces are affecting the indication unit.
•
the device is accessible for any necessary visual inspections and can be viewed from all sides.
•
the nameplate is clearly visible.
•
it can be operated from a location with secure footing.
Important notes for mounting
Important notes for mounting
Important notes for mounting
Important notes for mounting
•
Ensure area is known to be non hazardous before removing cover.
•
Do not open when energised or when an explosive atmosphere may be present.
•
Explosion hazard: Substitution of components may impair intrinsic safety.
•
Explosion hazard: Do not disconnect equipment unless power has been turned off or the area
is known to be non hazardous.
CAUTION!
The manufacturer is not liable for any damage resulting from improper use or use other than the
intended purpose. This applies in particular to hazards due to insufficient corrosion resistance
and suitability of the materials in contact with product.